Our Country Cottage A Narrative

Episode #14 A Floor, A Ceiling & ITB Month 15

Informações:

Synopsis

In this episode I will cover a couple of issues we had with the floor in the garage loft and the ceiling in the utility room. ITB, In The Beginning, will take a look at month 15 of construction, which is starting to get close to seeing snow again, and I will also have an update to the goings on at Our Country Cottage. The floor in the garage loft was to be low cost. No stamped cement with in floor radiant heating pipes here. In fact I didn’t want any fluids at all in the loft or garage. No plumbing to worry about. I saw the loft being the first place to be shut down to conserve energy in the winter. Sure I have had visions of a small pot belly stove in the corner somewhere, someday. During a visit to the floor/carpet/tile place I selected an inexpensive laminate that would do the job. These types of floors are very durable, being able to take a lot of punishment. Just the thing for a man cave, kinda place, with the odd table tennis match and work out area, not to mention various construction projects, yet t